ARTICLE X. ARCHITECTURAL CONTROL

In order to protect the quality and value of the homes built in the Project and for the continued protection of the Owners thereof, an Architectural Control Committee is hereby established consisting of three or more members to be appointed by Declarant as long as Declarant owns Lots in the Project. Thereafter, the Architectural Control Committee shall be appointed by the Board of Directors of the Association, to succeed the prior committee membership upon such appointment.

10.1
Approvals Required: No building, fence, wall, patio cover, window awning or other structure or landscaping improvements of any type shall be commenced, erected or installed upon any Lot, Common Area or other property within the Project, nor shall any exterior addition to or change of alteration of existing improvements be made, until the plans and specifications showing the nature, kind, shape, configuration, height, materials, location of the same and such other detail as the Architectural Control Committee may require (including but not limited to any electrical, heating or cooling systems), shall have been submitted to and approved in writing by the Architectural Control Committee as to harmony of external design and location in relation to surrounding structures and topography and as to conformity with the requirements of this Declaration. In the event the Architectural Control Committee fails to approve, disapprove, or specify the deficiency in, such plans, specification and location within thirty (30) days after submission to the Architectural Control Committee in such form as they may require, approval will not be required, and this Article will be deemed to haw been fully complied with.

10.2
Rules and Regulations: The Architectural Control Committee is hereby authorized to adopt Rules to govern its procedures including such rules as the Committee deems appropriate and in keeping with the spirit of due process of law with regard to the right of concerned parties due to be heard on any matter before the Committee, the Committee is further hereby empowered to adopt such regulations as it shall deem appropriate, consistent with the provisions of this Declaration including matters of design, materials and aesthetic interest.

10.3
Fees: The Architectural Control Committee may establish by its adopted rules, a fee schedule for an architectural review fee to be paid by each Owner submitting plans and specifications to the Committee for approval. No submission for approval will be considered complete until such fee has been paid. Such fee shall not exceed such reasonable amount as may be required to reimburse the Architectural Control Committee for the cost of professional review of submittals and the services of a consultant to administer the matter to its completion, including inspections which may be required.

10.4
Enforcement: The Architectural Control Committee may in it own name or on behalf of the Association, exercise all available legal and equitable remedies available to prevent or remove any unauthorized or unapproved construction or improvements on any Lot or the Property, or any portion thereof.

10.5
Waivers: The approval of any plans, drawings or specifications for any plans, improvements or construction, or for any matter; requiring the approval of the Architectural Control Committee, shall not be deemed a waiver of any right to withhold approval of any similar plan, drawing, specifications or matter subsequently for approval.

10.6
Liability: Neither the Architectural Control Committee nor any member thereof shall be liable to the Association, to any Owner, or to any other party, for any damage suffered or claimed on account of any act, action or lack of thereof, or conduct of the Architectural Control Committee, or the respective members thereof, acted in good faith on the basis of information they then possessed.


 